The Component Reference Numbers
hereunder, #1 - #39, represent the general overall Erection Sequence.
#19-22, #28-31 and #34-36 are generally preassembled on the ground.
If the overall height makes a Service Crane required or desired, it could
be installed after three sides of #14 have been installed. The
Service Crane would then finish #14 and bring up #15, 16 and 17.
|
|
|
|
|
|
|
|
# |
COMPONENT |
LENGTH |
WEIGHT |
CG RAD |
|
PRE- |
|
DESCRIPTION |
FT |
1,000 lbs |
FT |
|
ASSEMBLY |
|
|
|
|
|
|
|
1 |
Anchor Bolt Base Ring |
|
29.5 |
0.0 |
|
|
2 |
Swing Ring Bearing |
|
22.0 |
0.0 |
|
|
3 |
Rotating Swing Chassis |
|
151.0 |
0.0 |
|
|
4 |
Tower Section, M80 S |
30 |
38.0 |
0.0 |
|
|
5 |
Tower Section, M80 S |
40 |
51.0 |
0.0 |
|
|
6 |
Tower Section, M80 S |
40 |
51.0 |
0.0 |
|
|
7 |
Tower Section, M80 |
40 |
45.0 |
0.0 |
|
|
8 |
Tower Section, M80 |
40 |
45.0 |
0.0 |
|
|
9 |
Tower Section, M80 |
40 |
45.0 |
0.0 |
|
|
10 |
Tower Section, M80 |
40 |
45.0 |
0.0 |
|
|
11 |
Elevator, incl. Mast |
|
46.0 |
16.0 |
|
|
12 |
Jib Support Frame |
|
61.7 |
0.0 |
|
|
13 |
Operator's Cabin, incl. Support |
|
16.5 |
17.0 |
|
|
14 |
Tower Section |
30 |
42.1 |
0.0 |
|
|
15 |
Tower Section |
40 |
54.8 |
0.0 |
|
|
16 |
Tower Section |
20 |
29.4 |
0.0 |
|
|
17 |
Tower Head |
|
10.3 |
0.0 |
___ |
|
18 |
CW Jib Foot |
10 |
8.3 |
21.3 |
) |
| |
18A |
CW Trolley Winch |
|
3.4 |
26.0 |
) |
| |
19 |
CW Jib Section |
40 |
16.6 |
45.1 |
) |
Counterweight Jib |
20 |
CW Jib Section |
40 |
16.6 |
85.3 |
) |
#18 - #22 |
21 |
CW Jib Section |
40 |
16.6 |
124.7 |
) |
80,500 LBS |
22 |
CW Jib Section |
40 |
19.0 |
164.1 |
) |
| |
23 |
CW Jib Tie Bars |
|
24.2 |
93.5 |
)__ |
| |
24 |
Inner CW Trolley, w. CW |
|
182.6 |
34.6 |
|
|
25 |
Outer CW Trolley, w. CW |
|
88.2 |
178.0 |
|
|
26 |
Fixed CW |
|
220.0 |
179.0 |
___ |
|
27 |
Jib Foot |
10 |
11.5 |
18.7 |
) |
| |
28 |
Jib Section |
40 |
27.0 |
43.0 |
) |
| |
28A |
Trolley Winch |
|
5.3 |
25.8 |
) |
| |
28B |
Ultra Hoist Winch, excl. Rope |
|
27.5 |
39.8 |
) |
Inner Jib Half |
28C |
Hoist Winch, excl. Rope |
|
27.5 |
52.3 |
) |
#27 - #31 |
29 |
Jib Section |
40 |
27.0 |
82.3 |
) |
180,700 lbs |
30 |
Jib Section |
40 |
27.0 |
121.8 |
) |
| |
31 |
Jib Section |
40 |
27.9 |
161.1 |
)__ |
| |
32 |
Jin Tie Bars, Lower+B4 |
|
17.0 |
81.3 |
|
|
33 |
Strut Tower |
60 |
9.0 |
193.3 |
___ |
|
34 |
Jib Section |
40 |
27.0 |
200.5 |
) |
| |
35 |
Jib Section |
40 |
27.9 |
239.8 |
) |
Outer Jib Half |
36 |
Jib Section |
30 |
12.2 |
272.7 |
) |
#34 - #37 |
37 |
Load Trolleys, incl. Truss |
|
28.4 |
269.0 |
)__ |
95,500 lbs |
38 |
Jib Tie Bars, Upper |
|
14.9 |
81.3 |
|
|
39 |
Jib Tie Bars, Outer |
|
10.2 |
197.8 |
|
|
40 |
Hoist Cable |
|
12.5 |
52.3 |
|
|
41 |
Ultra Hoist Cable |
|
12.0 |
39.8 |
|
|
|
|
|
|
|
|
|
|
Total, w/o Load |
|
1,730.6 |
|
|
|
|
|
|
|
|
|
|
|
Total w. 264,000 lbs Hook Load |
|
1,994.6 |
|
|
|
|
|
|
|
|
|
|
|
Service Crane, RICHIER 1296 |
|
120.0 |
|
|
|
|
|
|
|
|
|
|
|
TOTAL WEIGHT, 1,000 LBS |
|
2,114.6 |
|
|
|
|
|
|
|
|
|
|
|